InfataDef Registred
Joined: 24 Apr 2013 Posts: 2 Location: Гора
|
Posted: Wed Apr 24, 2013 6:48 pm Post subject: Construction technics |
|
|
Even with the extensive land clearing that was required, the lack of existing infrastructure at the jobsite and the 69 days lost due to weather, our phased approach allowed us to complete the project one day ahead of the original schedule. http://stroibud.comli.com CIGNA was able to relocate to their new facility prior to the end of their leases and avoid the onerous penalties from the lease holder. _________________ http://building.comlu.com |
|